122 results found
Featured results
More results
To date, 112 IPP projects have been procured from four bidding round windows with further windows expected to be announced in the future
Taiyuan, like most northern cities in China, faces a serious shortage of clean heating and heat sources. Under the double pressure of environmental protection and people's livelihood, the Taiyuan government has adopted a low-cost, low energy consumption, environmental protection, which takes into account environment, peoples? livelihood and safety such as the Gujiao power plant, a long-distance transmission heat supply project using waste disposal heat.
Parties involved (public and private): The investment and construction of the project follows a "1 + 1 + X" model for investment and construction: 1 is the power company, 1 is the local government platform company, X is the social capital, which together forms the formation of multi-party joint platform company
Since the large-scale construction project was started in 1979, the Beijing Natural Gas Utilization System Project’s total investment has exceeded 30 billion RMB
Construct and operate 9 sections of expressway.
The project covers four towns around the county, benefiting 13,300 households and 126,300 people.After the implementation of the project, the average annual water saving is 21.58 million m3, and the water saving rate is 48.6%.
The project includes three subprojects: transfer solid waste to electricity, transfer food leftovers to biogas, transfer food leftovers to biodiesel.
Erhai Lake, whose basin area is 2,565 square kilometers with 117 rivers flowing into the lake, is the main drinking water source of the City of Dali, covering 16 villages and towns of Dali with a population of 833,000 people.
In Brazil, this Pipeline Project has the potential to diversify the fuel transportation infrastructure and consequently foster competitiveness and promote market development, resulting in benefits for society as a whole.
The project represents the most important tourism and transportation infrastructure proposal for the south-southeast region of the country.
Replacement of Champlain Bridge linking the municipality of Brossard (located on the South Shore) to Montreal.
An urban-rural partnership, the City of Guelph and Wellington County are known for being an agriculture hub as well a centre for social innovation.
As is the case in other parts of Atlantic Canada, Bridgewater suffers from a very high rate of energy poverty ? when households spend a large portion of their income on energy needs.
Winning communities of the Smart Cities Challenge sign a contribution agreement with the Government of Canada for a five year period.
PPP-Projects on Federal Highways, 5 Concessions (shadow toll) (2005-2011), 8 Availability-Projects (since 2009), 6 Availability-Projects in tender or pipeline (if efficient), widening from 4 to 6 lanes, mainly brownfield but as well some greenfield sections
The Gauteng Province embarked on a project to implement a state-of-the-art rapid rail network in Gauteng.
The Certification System's development brings together a wide range of experts including representatives of international financial, expert and civil organisations and associations such as the World Bank, the OECD and the World Wide Fund for Nature, consulting companies, leading infrastructure investors, executive authorities and other stakeholders.
The project consists of a road concession procurement for exploiting infrastructure and public services provision for recovery, operation, maintenance, monitoring, conservation, implementation of improvements and maintenance of the service level of the BR-262/ES Highway, in the road section between BR-101 (B) - Viana/ES - up to the frontier between ES/MG; BR-262/MG, in the road section between ES/MG frontier with BR-381/MG - João Monlevade/MG; and BR-381/MG, in the road section between Belo Horizonte/MG to Governador Valadares/MG
Brazilian Decree nº 7.520/2011 and then Decree nº 9.357/ 2018 establishes the National Program for the universalization of Access and Use of Electric Energy - “LUZ PARA TODOS/LIGHT FOR ALL” until the year 2022, intended to provide the service with electricity to the portion of the rural population that does not have access to this public service.
The modernization of the Roca Railway has as main objective the renovation and electrification of the passenger service line Branch Constitution - La Plata, which has an extension of 52 km and moves 44 million people by year.